The demands of water at grow-in are the greatest and what the pump station is often designed around. We've had a very gradual grow-in and do have quite a bit of flexability for our regular watering regime - which translates to a low concern for the demand on the pumps -- and the lake is pleanty big.
Showing posts with label irrigation. Show all posts
Showing posts with label irrigation. Show all posts
Thursday, November 29, 2007
1500 GPM - gallons per minute
The demands of water at grow-in are the greatest and what the pump station is often designed around. We've had a very gradual grow-in and do have quite a bit of flexability for our regular watering regime - which translates to a low concern for the demand on the pumps -- and the lake is pleanty big.
Wednesday, November 28, 2007
Installing the Pump
Tuesday, November 27, 2007
Irrigation Wet Well almost finished
Irrigation Crew starting the Wet Well
Please fill out the survey, it will be open for two weeks.
Sunday, November 25, 2007
Where is this crew?
To the right I've listed some ideas that I will be posting for this blog -- some sooner -- some later. I'd say this picture falls under the catagory of "behind the scenes construction". Everything about this project has been interesting to me. I'd very much like some your opinions about what is interesting and what you'd like to see or learn. Please let me know what coming soon items would be of most interest and any other topics are welcome too. I added a survey above the coming soon section for easier feedback.
Cheers.
Sunday, September 30, 2007
Perfect Fall Days
Saturday, September 1, 2007
The Wind in Action
This week while Don was testing some sprinklers and the pump station pressure at a point far away from the Station – I took a few shots. The wind was mild as compared to an average afternoon - in the photo it is coming from the right (south east). If you look close you can see the arc of the water – it bends in the clouds.
Sunday, August 26, 2007
Twofer – Setting the intake line & a few flowers
Wednesday, July 18, 2007
Well, well, well
I was on site today and the finish work that was completed recently is outstanding. It has the crew all very excited about the course - they won't stop hitting balls around the maintenance area. I didn't think to take a picture of them today - they were grinning from ear to ear. I'll get one for the blog next next time.
Tuesday, July 17, 2007
Irrigation Lift Off
Monday, July 16, 2007
The Taj Mahal of Pump Houses
In all seriousness, it is fantastic having an experienced superintendent – the end user – setting up the infrastructure in an efficient manner – the way it will (and wants to) be used. There are so many details that make so much sense.
Irrigation Pump Station Delivered
Tomorrow I'll have a great picture of the next step.
Wednesday, July 11, 2007
Irrigation As Built
I then compile the new measurements – recording during construction requires many individual days of measurement – to the image you see above.
There are a few more heads still out there, but thankfully not many.
Wednesday, June 27, 2007
Irrigation Pump Station Delivery
There are several live oaks in the picture because we wanted to hide the pump station as much as possible. It is quite far from the irrigation lake. It worked out well as it is closer to the maintenance area and easier to monitor. We do have it hooked up electronically to our control system, but Don is a believer in using your eyes also.
I'll show how much further we hid the maintenance facility later.
Subscribe to:
Posts (Atom)