Tuesday, November 27, 2007

Irrigation Wet Well almost finished

Taking my cue from the survey at right (please share your opinion)... This picture was taken last winter, note the jackets. Here the crew is adding the third stage to the wet well. The lake is connected at the bottom and the pumps will sit on top of the hole and draw the water out and it is fed by the lake. Aside from the final structure being the Taj Mahal of pump houses, what I found most unique was where we had the pump station located. The picture below gives a hint.

This 24" diameter pipe is what we used to connect the lake to the pump station. Each piece is 14' long, and not all are shown. The unique part is that the pump is over 600' away from the lake -- hidden in the trees. We went to great lengths to hide everything that wasn't grass or a bunker. This link contains a picture from a previous post about our maintenance facility. The stone road passes through the two buildings and then heads to the pump station, which is near the end of the live oaks. If you look at the far left edge of the picture you will see the beginning of the lake -- 600 feet away. The cleaner unincumbered look was very much worth the effort. It is also much easier to get to the pump station from the maintenance facility, and it is on the way to the course so Don and the staff will easiliy be able to check on the pump throughout the day.

No comments:

Post a Comment

Submit a comment and I'll make sure it isn't spam and post it asap. Thank you.

Related Posts Plugin for WordPress, Blogger...